GENERAL METAL FABRICATION

$52,592  NPV

7/10 RoofScore



$305,541  Project Value

PV 175.8kW @ $1.70/W = $298,934
Storage 5.0105kW / 6.6072kWh @ $1.50/$1.00 = $6,607

Go to Google Maps isometric view



Building

WHOLESALE-RETAIL CLASS 1

Tariff: E-19 Medium General Demand TOU (Transmission)

Permit History

1234

1234


Site Attributes

business_name GENERAL METAL FABRICATION
site_type WHOLESALE-RETAIL CLASS 1
latitude 37.61411454
longitude -122.08501629999999
address 2438 TRIPALDI WAY
ZIP 94545
site_tariff_rate_label 5a340f215457a346235c48a1
site_tariff_rate_name E-19 Medium General Demand TOU (Transmission)
land_acres N/A
roof_squarefeet 34312
net_metering_limit_kw 1000
gcr 0.6
dc_ac_ratio 1.25
load_profile_used RefBldgStripMallNew2004_7
Customer ID7
Site unique ID
(generated by DB,
replace with uuid soon)
2605


Case A (no Solar)

Net LSE Margin for 2018 $12,792
Customer Charges for 2018 $48,860
azimuth (input) 180.0 degrees
Solar size result 0.0kW
Battery result 0.0 kW, 0.0 kWh
NPV USD $0


Case B (PV + Storage)

Net LSE Margin for 2018 $4,687
Customer Charges for 2018 $36,557
azimuth (input) 180.0 degrees
Solar size result 175.8kW
Battery result 5.0105 kW, 6.6072 kWh
NPV USD $52,592


Case C (PV + Storage, azimuth optimized for utility balance)

Net LSE Margin for 2018 $5,059
Customer Charges for 2018 $33,132
azimuth (input) 225.0 degrees
Solar size result 195.1kW
Battery result 5.5414 kW, 7.3073 kWh
NPV USD $67,812


Potential Customer Savings 2018 A => C
$15,728

See full JSON responses for A, B, C