PSS ELECTRONIC SYSTEMS DIV OF PREDATOR

$118,182  NPV

7/10 RoofScore



$784,038  Project Value

PV 456.5kW @ $1.70/W = $775,966
Storage 6.1217kW / 8.0725kWh @ $1.50/$1.00 = $8,072

Go to Google Maps isometric view



Building

ELECTRICAL CONTRACTOR ANNUAL

Tariff: E-19 Medium General Demand TOU (Transmission)

Permit History

1234

1234


Site Attributes

business_name PSS ELECTRONIC SYSTEMS DIV OF PREDATOR
site_type ELECTRICAL CONTRACTOR ANNUAL
latitude 37.66593622
longitude -122.0837881
address 22924 SUTRO ST
ZIP 94541
site_tariff_rate_label 5a340f215457a346235c48a1
site_tariff_rate_name E-19 Medium General Demand TOU (Transmission)
land_acres N/A
roof_squarefeet 2976
net_metering_limit_kw 1000
gcr 0.6
dc_ac_ratio 1.25
load_profile_used Hayward_Generic
Customer ID352
Site unique ID
(generated by DB,
replace with uuid soon)
2950


Case A (no Solar)

Net LSE Margin for 2018 $32,348
Customer Charges for 2018 $123,093
azimuth (input) 180.0 degrees
Solar size result 0.0kW
Battery result 0.0 kW, 0.0 kWh
NPV USD $0


Case B (PV + Storage)

Net LSE Margin for 2018 $6,665
Customer Charges for 2018 $81,496
azimuth (input) 180.0 degrees
Solar size result 456.5kW
Battery result 6.1217 kW, 8.0725 kWh
NPV USD $118,182


Case C (PV + Storage, azimuth optimized for utility balance)

Net LSE Margin for 2018 $5,987
Customer Charges for 2018 $72,652
azimuth (input) 225.0 degrees
Solar size result 507.0kW
Battery result 4.7652 kW, 6.2838 kWh
NPV USD $163,620


Potential Customer Savings 2018 A => C
$50,441

See full JSON responses for A, B, C