P & H AUTO SERVICE
$105,761 NPV
7/10 RoofScore
$796,978 Project Value
PV | 464.1kW | @ $1.70/W | = | $788,906 |
Storage | 6.1217kW / 8.0725kWh | @ $1.50/$1.00 | = | $8,072 |
Go to Google Maps isometric view
Building
AUTO BODY SHOP
Tariff: E-19 Medium General Demand TOU (Transmission)
Permit History
1234
1234
Site Attributes
business_name | P & H AUTO SERVICE |
site_type | AUTO BODY SHOP |
latitude | 37.63912827 |
longitude | -122.1290117 |
address | 23888 CONNECTICUT ST 8 |
ZIP | 94545 |
site_tariff_rate_label | 5a340f215457a346235c48a1 |
site_tariff_rate_name | E-19 Medium General Demand TOU (Transmission) |
land_acres | N/A |
roof_squarefeet | 21390 |
net_metering_limit_kw | 1000 |
gcr | 0.6 |
dc_ac_ratio | 1.25 |
load_profile_used | Hayward_Generic |
Customer ID | 973 |
Site unique ID (generated by DB, replace with uuid soon) | 3571 |
Case A (no Solar)
Net LSE Margin for 2018 | $32,348 |
Customer Charges for 2018 | $123,093 |
azimuth (input) | 180.0 degrees |
Solar size result | 0.0kW |
Battery result | 0.0 kW, 0.0 kWh |
NPV USD | $0 |
Case B (PV + Storage)
Net LSE Margin for 2018 | $5,935 |
Customer Charges for 2018 | $81,127 |
azimuth (input) | 180.0 degrees |
Solar size result | 464.1kW |
Battery result | 6.1217 kW, 8.0725 kWh |
NPV USD | $105,761 |
Case C (PV + Storage, azimuth optimized for utility balance)
Net LSE Margin for 2018 | $5,726 |
Customer Charges for 2018 | $73,936 |
azimuth (input) | 225.0 degrees |
Solar size result | 507.7kW |
Battery result | 6.2409 kW, 8.2297 kWh |
NPV USD | $141,117 |
Potential Customer Savings 2018 A => C
$49,157