CA102

$336,631  NPV

7/10 RoofScore



$1,700,000  Project Value

PV 1e+03kW @ $1.70/W = $1,700,000
Storage 0.0kW / 0.0kWh @ $1.50/$1.00 = $0

Go to Google Maps isometric view



Building

Distribution Center

Tariff: E-19 Medium General Demand TOU (Transmission)

Permit History

1234

1234


Site Attributes

business_name CA102
site_type Distribution Center
latitude 33.13254833
longitude -117.2466483
address 2858 Loker Avenue East
ZIP 92010
site_tariff_rate_label 5a340f215457a346235c48a1
site_tariff_rate_name E-19 Medium General Demand TOU (Transmission)
land_acres N/A
roof_squarefeet 59112.2
net_metering_limit_kw 1000
gcr 0.6
dc_ac_ratio 1.25
load_profile_used FlatLoad
annual_kwh 2648219
sizes_b 1000kW, 0kWh
Customer ID2032