MUFG UB 240 MPSC
$2,229,819 NPV
7/10 RoofScore
$9,358,960 Project Value
PV | 4.917e+03kW | @ $1.70/W | = | $8,358,960 |
Storage | 500.0kW / 1000.0kWh | @ $1.50/$1.00 | = | $1,000,000 |
Go to Google Maps isometric view
Building
Office
Tariff: E-19 Medium General Demand TOU (Transmission)
Permit History
1234
1234
Site Attributes
business_name | MUFG UB 240 MPSC |
site_type | Office |
latitude | 34.038852 |
longitude | -118.11403600000001 |
address | 1980 saturn street |
ZIP | 91755 |
site_tariff_rate_label | 5a340f215457a346235c48a1 |
site_tariff_rate_name | E-19 Medium General Demand TOU (Transmission) |
land_acres | N/A |
roof_squarefeet | 300456.1 |
net_metering_limit_kw | 1000 |
gcr | 0.6 |
dc_ac_ratio | 1.25 |
load_profile_used | MediumOffice |
annual_kwh | 14969970 |
sizes_b | 4917kW, 1000kWh |
Customer ID | 207 |
Site unique ID (generated by DB, replace with uuid soon) | 8210 |